Free on-site quotes7 days a weekEdmonton · St. Albert · Sherwood Park · Spruce GroveLocally owned & operatedThe Go-To Drywall Contractor for Repair, Restoration & Finishing

Suite separations in Hollick-Kenyon: fire, sound and the finish

A legal suite in Hollick-Kenyon lives or dies on two assemblies: the fire separation between the units and the sound separation between them. Both are specified on the drawings your permit was issued against, and both are inspected before anything covers them. We build to those drawings and sequence around the inspection rather than working ahead.

Legal Suite Drywall Hollick-Kenyon Edmonton

Watch legal suite drywall jobs in Hollick Kenyon Edmonton on our YouTube channel

What we hand over at the end

Photographs of what got covered

Assemblies get buried. We photograph the rated and sound work before boarding so there is a record of what is behind the finish.

Why it matters later

When an Hollick-Kenyon suite is sold, refinanced or re-inspected, being able to show what was built is worth having. It costs us minutes and it has saved clients real arguments.

Hollick-Kenyon drywall in context

About Hollick-Kenyon

The neighbourhood was named after Herbert "Bertie" Hollick-Kenyon, who piloted flights over the Antarctic as part of the first mapping of that territory.

What we see in Hollick-Kenyon

In Hollick-Kenyon the drywall work is first-year settling, basement dev for first owners, Level 5 over builder-grade. We confirm what your home actually needs on site, in writing, before anything starts.

Sequencing around your inspections

Inspected before covered

Rated and sound assemblies in Hollick-Kenyon are checked before the finish goes on. That sets the order of work, not the other way round.

How we plan it

We board and firestop to suit your inspection date rather than working ahead. If an inspection slips, we would rather pause than cover something the inspector needs to see.

The two assemblies a suite lives on

Fire and sound

A legal suite in Hollick-Kenyon depends on a fire separation between the dwelling units and a sound separation between them. They are different requirements built into the same walls and ceilings.

Both are specified

Neither is a matter of preference. Both come off the drawings your permit was issued against, and both are inspected before anything covers them.

Finish level for a rental

Durable beats showy

A Hollick-Kenyon suite is a rental. A sound Level 4 finish, good corner bead and a hard-wearing paint will look better in three years than a high finish level that gets knocked.

Where to spend instead

Better corners, moisture-resistant board where it matters, and the sound assembly. Those are what a tenant experiences daily and what a landlord stops getting calls about.

What affects the cost of legal suite drywall in Hollick-Kenyon in Edmonton?

Suite size and required assemblies

The cost in Hollick-Kenyon depends on the suite size and the rated assemblies — the fire separation, sound walls and moisture-resistant areas all add to a plain basement finish. We price off the suite layout and the spec.

Built to pass in Hollick-Kenyon

Suite conversions are common here, and the drywall is a big part of passing inspection. We build the fire and sound assemblies to the City of Edmonton suite spec so your Hollick-Kenyon suite passes.

Ceiling height and what it costs you

Assemblies take space

A rated, sound-dampened Hollick-Kenyon basement ceiling with resilient channel and two layers of board takes more height than a simple boarded ceiling.

The trade-off

In a basement where headroom is already tight, every assembly decision costs ceiling height. We tell you what each option takes so the trade is made deliberately rather than discovered when the drywall is up.

Simple, clean, on schedule — Legal Suite Drywall in Hollick Kenyon Edmonton

1

Free quote

We come out to your Hollick Kenyon Edmonton property, take a real look at the legal suite drywall, and hand you a fixed price on the spot — no guessing, no vague ballpark. Every legal suite drywall quote in Hollick Kenyon Edmonton starts with an honest, on-site assessment.

2

Book a day

We pick a day that works for your schedule and show up on time, ready to start the legal suite drywall in Hollick Kenyon Edmonton. No back-and-forth rescheduling — once it's booked, our team is there.

3

The work

We keep the dust under control and protect your Hollick Kenyon Edmonton home while we finish the legal suite drywall to a clean, paint-ready standard. Floors covered, doors sealed off, and the site left tidy at the end of every day.

4

Walk it with you

We don't pack up till you've walked the finished legal suite drywall with us and you're happy with the result in Hollick Kenyon Edmonton. If anything needs a second look, we handle it before we call the job done.

Rated by Edmonton Homeowners

Emplastrum Drywall is the legal suite drywall contractor Hollick Kenyon Edmonton trusts for repair, restoration and finishing — rated on Google by Edmonton homeowners.

Read the reviews, or leave your own after your legal suite drywall project in Hollick Kenyon Edmonton.

Read our reviews on Google

Legal Suite Drywall Hollick-Kenyon Edmonton: your questions answered

Is the ceiling or the wall the bigger job?
Usually the ceiling. It carries the fire separation, most of the sound transmission and all the mechanical running between floors, so it needs the most coordination with other trades.
Do you stand behind your legal suite drywall in Hollick-Kenyon in Edmonton?
Yes. We build to the suite spec and walk the finished Hollick-Kenyon suite with you, and if something is not right we come back and make it right.
Can you sequence around the inspections?
That is how it has to be done. Rated and sound assemblies in Hollick-Kenyon are inspected before finish covers them, so we board and firestop to suit your inspection date rather than closing something the inspector needs to see.
Does your Hollick-Kenyon work include the fire and sound separation?
Yes — we install the Hollick-Kenyon suite’s two core assemblies to spec: fire-rated ceiling, sound-dampened party walls.
How much sound separation will a suite actually get?
Enough that normal speech between the units is not intelligible, when the assembly on the drawings is built properly and the perimeters are sealed. It will not be silent, and footstep noise is the hardest part. We would rather set that expectation now.
Do you work from my permit drawings?
Yes, and we would rather see them before quoting. The assemblies are a specification, not a preference, and the drawings decide the board, the layers and the joint treatment. If what is specified does not match what is on site, we tell you before boarding.

Need Edmonton’s go-to drywall contractor for repair, restoration and finishing? One trusted team for boarding, taping, finishing, repairs & renovations — start to finish.

Your Drywall Contractor in Edmonton →
Get Your Free Drywall Quote
Tell us about your project — we’ll get right back to you, 7 days a week. Prefer to call? (403) 829-8702.
No obligation. We never share your information.
📞  Call (403) 829-8702 Free Quote
See our latest drywall projects & updates on FacebookFollow Emplastrum Drywall — Edmonton, St. Albert, Sherwood Park, Spruce Grove & Stony Plain Follow on Facebook