Free on-site quotes7 days a weekEdmonton · St. Albert · Sherwood Park · Spruce GroveLocally owned & operatedThe Go-To Drywall Contractor for Repair, Restoration & Finishing

Drywall installation hung straight and screwed off right

A good Steinhauer finish starts with good boarding. In Steinhauer the board goes up level, correctly screwed, seams on framing, clean cuts at mechanical and corners. Steinhauer is one of Whitemud’s newest communities — most homes have framed, unfinished basements ready for boarding. We cover Steinhauer, Aspen Gardens, Bearspaw, Blue Quill and the surrounding area, 7 days a week.

Drywall Installation Steinhauer Edmonton

What affects the cost of drywall installation in Steinhauer in Edmonton?

Square footage, board type and ceiling complexity

The cost of drywall installation in Steinhauer comes down to the total square footage, the board type (standard, moisture-resistant, fire-rated and soundproof price differently), and whether the job is a new development or a renovation around existing trades. We measure on site and give a fixed price before we start.

Board spec in Steinhauer

The work here usually calls for settling cracks, nail pops and tired texture. The Steinhauer quote maps each surface to its correct board — no inspection surprises.

Steinhauer drywall in context

About Steinhauer

The neighbourhood is named for Henry Bird Steinhauer, a missionary who settled in Alberta during the mid-1800s (and from whom the family of the former Lieutenant Governor takes its name).

What we see in Steinhauer

In Steinhauer the drywall work is plaster and lath repair, popcorn and stipple ceiling removal, careful patching into original surfaces. We confirm what your home actually needs on site, in writing, before anything starts.

Drywall installation work we do across Edmonton in Edmonton

Basement development boarding in Edmonton — new builds and existing homes

The most common boarding call across Edmonton is full basement development. In newer Edmonton communities — Aspen Gardens, Bearspaw, Blue Quill — the builder framed the basement and the homeowner is ready to develop it. We board ceiling first, then the walls, with moisture-resistant on every exterior foundation wall. In older Edmonton communities — Aspen Gardens, Bearspaw, Blue Quill — the call is often a legal suite conversion with fire-rated and soundproof board to spec.

Renovation boarding and room additions in established Edmonton communities

Established Edmonton homeowners renovating their main floors call us for boarding after walls come down. Kitchen open-ups, room additions, bathroom relocations — all require new board hung to match the adjacent surfaces. We assess the framing, select the right board thickness, hang level and leave the newly boarded walls ready for taping. No visible seam between old and new.

Our Edmonton drywall installation process in Edmonton, step by step

Ceiling board first — always

Every boarding job in Edmonton starts with the ceiling. Ceiling board goes up before the walls because the wall board butts up under the ceiling board and helps carry it. Reversing the sequence leaves ceiling joints carrying their own weight unsupported — they perform worse under the tape and are more likely to crack over time. No Steinhauer wall board goes up before the ceiling is complete.

Wall boarding — screw pattern, joint placement and board selection

Wall board goes up with the correct screw pattern: every 12 inches on the field, every 8 inches at the perimeter. All seams land on framing. Clean, square corners — inside and out — on Steinhauer jobs. We hold Steinhauer board to the window and door frames, no overrun. When the boarding is complete, every surface is at the right plane, the taping crew can start immediately and there is no rework to do before they begin.

Ceilings first, then walls

The order is not arbitrary

Ceiling board goes up first so the wall sheets push up underneath and support its edges.

What it prevents

Doing it the other way leaves the ceiling perimeter unsupported, and in an Steinhauer room that is where the cracking starts. It also gives a tighter joint at the wall-ceiling line, which is the joint people look at most.

What affects the cost of drywall installation in Edmonton in Edmonton?

Square footage, board type and ceiling complexity

The cost of drywall installation in Edmonton comes down to four things: total square footage of wall and ceiling, board type (standard, moisture-resistant, fire-rated and soundproof are priced differently), ceiling complexity (flat ceilings vs. vaulted, cathedral, bulkheads and soffits), and whether the job is a new development or a renovation around existing trades and fixtures. We measure on site and give you a fixed price before we start.

Board spec in Edmonton — right product on every surface

Exterior foundation walls need moisture-resistant board. Moisture-resistant board on all Steinhauer bathroom and laundry walls. Legal suite ceilings need 5/8” Type X fire-rated board. Party walls between a suite and the main living area need STC soundproof board. In Steinhauer, moisture-free interior walls use standard 1/2” board. We map every surface at the on-site quote and specify the right product — so there are no surprises when the inspector comes.

Why Edmonton homeowners trust Emplastrum for drywall installation in Edmonton

We board the way a finishing specialist wants it boarded

Most boarding crews treat installation as a volume game — get the board up, move on. Every taping problem we have fixed over the years started with a boarding problem underneath it. We board every Edmonton job the way we would want it boarded before we tape it: ceiling first, correct screw pattern, seams on framing, board plumb. The finish is better because the boarding behind it is right.

Fixed price, same-day reply, all Edmonton quadrants

We cover all four Edmonton quadrants, Edmonton, Aspen Gardens, Bearspaw, Blue Quill and Edmonton, 7 days a week — every established and newer Edmonton community from Aspen Gardens, Bearspaw, Blue Quill to Aspen Gardens, Bearspaw, Blue Quill. Free on-site quotes, fixed prices — you know the number before we start and it does not change.

Simple, clean, on schedule — Drywall Installation in Steinhauer Edmonton

1

Free quote

We come out to your Steinhauer Edmonton property, take a real look at the drywall installation, and hand you a fixed price on the spot — no guessing, no vague ballpark. Every drywall installation quote in Steinhauer Edmonton starts with an honest, on-site assessment.

2

Book a day

We pick a day that works for your schedule and show up on time, ready to start the drywall installation in Steinhauer Edmonton. No back-and-forth rescheduling — once it's booked, our team is there.

3

The work

We keep the dust under control and protect your Steinhauer Edmonton home while we finish the drywall installation to a clean, paint-ready standard. Floors covered, doors sealed off, and the site left tidy at the end of every day.

4

Walk it with you

We don't pack up till you've walked the finished drywall installation with us and you're happy with the result in Steinhauer Edmonton. If anything needs a second look, we handle it before we call the job done.

Rated by Edmonton Homeowners

Emplastrum Drywall is the drywall installation contractor Steinhauer Edmonton trusts for repair, restoration and finishing — rated on Google by Edmonton homeowners.

Read the reviews, or leave your own after your drywall installation project in Steinhauer Edmonton.

Read our reviews on Google

Drywall Installation Steinhauer Edmonton: your questions answered

Does it matter which way the board runs?
Yes. Running horizontally puts one long joint at a comfortable working height instead of several vertical ones and usually means fewer joints. Joint placement decides how much finishing the room needs.
Does Steinhauer taping follow straight after boarding?
Yes — we hang board with seams on framing, correct screw pattern and plumb walls, so a taper (or we ourselves) can start the very next day in Steinhauer.
How long does drywall installation take in a Steinhauer home in Edmonton?
A standard basement in a Steinhauer home typically takes one to two days to board. New construction or a big reno in Steinhauer runs a longer schedule. The Steinhauer timeline you get at the quote is realistic, not optimistic. In Steinhauer, finishing usually begins the day after boarding wraps.
Do you hang the ceiling board first?
Yes, always. Ceiling board goes up before wall board on every job in Steinhauer. In Steinhauer, the wall board tucks under the ceiling board to support it. Out of order, Steinhauer ceiling joints carry their own weight and crack sooner. In Steinhauer, walls wait until the ceiling is boarded.
What board do you use on Steinhauer exterior basement walls?
Moisture-resistant board on all Steinhauer exterior foundation walls and around plumbing and laundry. Standard 1/2-inch board for interior walls away from moisture in your Steinhauer home.
Do you board for legal suites in Edmonton?
Yes, and we know the spec. A legal secondary suite in Edmonton requires 5/8” Type X fire-rated board on the ceiling separating the suite from the floor above, STC soundproof board on party walls, and moisture-resistant in all wet areas. We board to that spec so the suite passes inspection.

Need Edmonton’s go-to drywall contractor for repair, restoration and finishing? One trusted team for boarding, taping, finishing, repairs & renovations — start to finish.

Your Drywall Contractor in Edmonton →
Get Your Free Drywall Quote
Tell us about your project — we’ll get right back to you, 7 days a week. Prefer to call? (403) 829-8702.
No obligation. We never share your information.
📞  Call (403) 829-8702 Free Quote
See our latest drywall projects & updates on FacebookFollow Emplastrum Drywall — Edmonton, St. Albert, Sherwood Park, Spruce Grove & Stony Plain Follow on Facebook