Free on-site quotes7 days a weekEdmonton · St. Albert · Sherwood Park · Spruce GroveLocally owned & operatedThe Go-To Drywall Contractor for Repair, Restoration & Finishing

Batt insulation in Allard before the vapour barrier goes on

A batt only performs if it fills the cavity completely and is not squashed. In Allard the two things that ruin it are compression — jamming a wider batt into a narrow bay — and gaps around wiring and boxes, where the insulation is stuffed behind rather than split around.

Batt Insulation Allard Edmonton

Watch batt insulation jobs in Allard Edmonton on our YouTube channel

Sound as a side effect of insulating

You get some for free

Filling an interior Allard wall cavity with batts noticeably reduces voice and television noise between rooms, even when sound was not the reason for the job.

Where to spend a little more

If a bedroom, office or bathroom wall is being opened anyway, upgrading that specific cavity to a denser acoustic or mineral wool batt costs very little on top of work already happening. We will point out which walls those are while we are quoting.

Allard drywall in context

What we see in Allard

In Allard the drywall work is first-year settling, basement dev for first owners, Level 5 over builder-grade. We confirm what your home actually needs on site, in writing, before anything starts.

Insulating around plumbing on an exterior wall

Pipes belong on the warm side

A water line run in an Allard exterior wall cavity with the batt behind it is sitting on the cold side of the insulation. In February that is a freeze risk.

What we do

Wherever the plumbing allows, the insulation goes behind the pipe so the pipe stays in the heated space. Where it does not, we flag it rather than boarding over a line we know is exposed.

Compression is the most common Allard mistake

A squashed batt is a weaker batt

Batt insulation works because of the still air trapped in it. Compress it into a narrower bay and you lose a meaningful share of its performance while paying for the full product.

The fix is measurement

Allard framing is not always at a standard spacing, especially in older homes and renovations. We measure the bays and cut to fit rather than forcing a standard batt into a non-standard cavity.

Cathedral ceilings and the ventilation gap

Do not fill it to the deck

In a vaulted Allard ceiling there has to be an air channel between the insulation and the roof sheathing. Packing batts tight to the deck closes it, and the roof has no way to dry.

What that costs later

Damp sheathing, mould and in the worst cases rot — none of it visible until it is expensive. The batt is sized so the channel stays open, which means accepting slightly less insulation depth in exchange for a roof that lasts.

Friction fit, not stapled tight

How a batt is meant to sit

An unfaced batt holds itself in an Allard bay by friction across its full width, touching the framing on both sides and the sheathing behind.

The common shortcut

Pulling a faced batt tight and stapling the flanges to the face of the stud, which dishes the middle and leaves a void behind. It looks tidy from the room and performs worse than it measures.

Wiring, boxes and the gaps behind them

Where the cold gets in

The fastest way to ruin a wall in Allard is to stuff the batt behind the wiring and the electrical boxes. It leaves an uninsulated void exactly where there is already a hole in the vapour barrier.

Split, do not stuff

The batt is split so half sits behind the cable and half in front, and it is cut around boxes rather than compressed past them. It is slower and it is the difference between a wall that performs and one that only looks insulated.

Simple, clean, on schedule — Batt Insulation in Allard Edmonton

1

Free quote

We come out to your Allard Edmonton property, take a real look at the batt insulation, and hand you a fixed price on the spot — no guessing, no vague ballpark. Every batt insulation quote in Allard Edmonton starts with an honest, on-site assessment.

2

Book a day

We pick a day that works for your schedule and show up on time, ready to start the batt insulation in Allard Edmonton. No back-and-forth rescheduling — once it's booked, our team is there.

3

The work

We keep the dust under control and protect your Allard Edmonton home while we finish the batt insulation to a clean, paint-ready standard. Floors covered, doors sealed off, and the site left tidy at the end of every day.

4

Walk it with you

We don't pack up till you've walked the finished batt insulation with us and you're happy with the result in Allard Edmonton. If anything needs a second look, we handle it before we call the job done.

Rated by Edmonton Homeowners

Emplastrum Drywall is the batt insulation contractor Allard Edmonton trusts for repair, restoration and finishing — rated on Google by Edmonton homeowners.

Read the reviews, or leave your own after your batt insulation project in Allard Edmonton.

Read our reviews on Google

Batt Insulation Allard Edmonton: your questions answered

Does the garage wall need anything special?
Usually yes — a fire separation as well as insulation, planned together because the board is specified. Insulation and vapour control go in and get inspected, then the rated board goes on.
My room is cold and draughty. Will batts fix it?
Probably not on their own. Draughts around windows, an unsealed rim joist or gaps at the top plate are air leaks, and insulation does not stop air. We would rather diagnose the draught and quote the sealing, which is usually the cheaper half.
There is a water pipe in my exterior wall. What happens to it?
Wherever the plumbing allows, the insulation goes behind the pipe so the pipe stays on the heated side. If it cannot, we flag it rather than boarding over a line we know is exposed to freezing.
Does it matter if the batt is squashed in a bit?
Yes, more than most people expect. Batts work through trapped still air, so compressing one into a narrow bay costs a real share of its performance. We measure the Allard bays and cut to fit rather than forcing a standard batt in.
Do you install the vapour barrier as well?
Yes, and the order matters. Insulation is completed first, the barrier goes on the warm side and is sealed at penetrations before boarding. None of it can be corrected once the drywall is up.
Can you insulate my finished walls without removing the drywall?
Not with batts — they need an open cavity. That is a job for a blown-in or injected product, or for adding insulation on the room side. We will tell you that rather than sell you a partial job.
Get Your Free Drywall Quote
Tell us about your project — we’ll get right back to you, 7 days a week. Prefer to call? (403) 829-8702.
No obligation. We never share your information.
📞  Call (403) 829-8702 Free Quote
See our latest drywall projects & updates on FacebookFollow Emplastrum Drywall — Edmonton, St. Albert, Sherwood Park, Spruce Grove & Stony Plain Follow on Facebook