Free on-site quotes7 days a weekEdmonton · St. Albert · Sherwood Park · Spruce GroveLocally owned & operatedThe Go-To Drywall Contractor for Repair, Restoration & Finishing

Drywall installation in Matt Berry — hung straight, screwed off right

In Matt Berry, the install sets up the finish. Level hanging, right screws, framed seams and clean mechanical/corner cuts — the Matt Berry standard. Matt Berry homes from the 2000s and 2010s were built with framed, unfinished basements. Full basement boarding is the most common installation call here. We cover Matt Berry, Balwin, Bannerman, Belmont and the surrounding area, 7 days a week.

Drywall Installation Matt Berry

Our drywall installation process in Matt Berry, step by step

Ceiling board first — always — in Matt Berry homes

Every boarding job in Matt Berry starts with the ceiling. The Matt Berry ceiling boards first so the wall board can butt under and support it. In Matt Berry, skipping the sequence leaves joints carrying their own weight — cracks follow. No Matt Berry wall board goes up before the ceiling is complete. It is a small thing that makes a significant difference in long-term performance.

Wall boarding, screw pattern and joint placement in Matt Berry

Wall board goes up with the correct screw pattern — every 12 inches on the field, every 8 inches at the perimeter. Seams on framing, not between studs — the Matt Berry standard. Clean, square corners — inside and out — on Matt Berry jobs. We hold Matt Berry board to the window and door frames, no overrun. When the boarding is done in a Matt Berry home, every surface is at the right plane and the taping crew can go straight to work.

Matt Berry drywall in context

About Matt Berry

Matt Berry was named in honour of a Canadian aviation pioneer.

What we see in Matt Berry

In Matt Berry the drywall work is popcorn and stipple ceiling removal, settling+truss-uplift cracks, nail pops, Poly-B repipe patching repipe patching. We confirm what your home actually needs on site, in writing, before anything starts.

Why Matt Berry homeowners trust Emplastrum for drywall installation

Board it right for the finish

Behind every Matt Berry taping problem we have fixed was a boarding problem first. We board every Matt Berry job the way we would want it boarded before we tape it.

Fixed price, same-day reply

We install drywall across Matt Berry and Northeast, 7 days a week. For Matt Berry homeowners: free quote, fixed number, backed workmanship. Any issue on an Matt Berry boarding job earns a return trip and a proper fix.

What affects the cost of drywall installation in Matt Berry?

Square footage, board type and ceiling complexity in Matt Berry

The cost of drywall installation in Matt Berry comes down to four main factors: total square footage of wall and ceiling, board type (standard, moisture-resistant, fire-rated and soundproof are different costs), ceiling complexity (flat vs. vaults, bulkheads and soffits add time), and new development vs renovation around the existing Matt Berry trades and fixtures. We measure on site and give you a fixed price before we start.

Board spec for Matt Berry homes — right product on every surface

Not every surface in an Matt Berry home needs the same board. Exterior foundation walls need moisture-resistant. In Matt Berry, every bathroom and laundry wall takes moisture-resistant board. An Matt Berry suite ceiling requires 5/8” Type X fire-rated board. In Matt Berry, suite-to-living party walls do better with STC soundproof board. For dry Matt Berry interior walls, standard 1/2” board is right. In Matt Berry, the correct board per surface is set at the quote, not after inspection.

Our Matt Berry drywall installation process, step by step

Ceiling board first, always

Every boarding job in Matt Berry starts with the ceiling, because the wall board butts up under it and helps carry it. Reversing the sequence leaves Matt Berry ceiling joints unsupported and more likely to crack later.

Wall boarding, screw pattern and seams

Wall board goes up with the correct screw pattern and every seam lands on framing. When the Matt Berry boarding is done, the taping crew can start immediately with no rework.

Drywall installation work we do in Matt Berry

Room addition and partition boarding in Matt Berry homes

Matt Berry homes from the late 1980s and 1990s are at the age where homeowners are adding partitions, converting rooms and opening up floor plans. New walls go up and existing rooms get reboarded when layouts change. We hang standard 1/2” board on all new partition walls, confirm the framing is square before we start and leave the new walls ready for the taping crew. Board seams land on studs, corners are clean and nothing is proud of the adjacent surface.

Water damage reboarding in Matt Berry

Water damage in Matt Berry homes from the late 1980s and 1990s is one of the most common boarding calls we get. A bathroom leak, a roof problem or a burst pipe means the affected board comes out and new board goes up on the exposed framing. We assess what needs to come down, remove only what is damaged, re-board to match the existing surface height and leave the wall ready for taping.

Why Matt Berry homeowners trust Emplastrum for drywall installation

Boarding done right means the finish can be done right in Matt Berry

The quality of a Level 4 wall finish starts with the boarding behind it. Poorly hung Matt Berry board — not level, seams mid-bay, screws too far — fights the finish. We board every Matt Berry job the way a taping specialist would want it boarded — because we are the taping specialist. When we finish the boarding, we can finish the taping to Level 4 without fighting the installation underneath.

Fixed price, same-day reply, all four Edmonton quadrants, Edmonton, Balwin, Bannerman, Belmont and Edmonton

We cover all four Edmonton quadrants, Edmonton, Balwin, Bannerman, Belmont and Edmonton, 7 days a week — Matt Berry, Balwin, Bannerman, Belmont and every community in between. Fixed Matt Berry pricing means the pre-start figure survives arrival.

Simple, clean, on schedule — Drywall Installation in Matt Berry

1

Free quote

We come out to your Matt Berry property, take a real look at the drywall installation, and hand you a fixed price on the spot — no guessing, no vague ballpark. Every drywall installation quote in Matt Berry starts with an honest, on-site assessment.

2

Book a day

We pick a day that works for your schedule and show up on time, ready to start the drywall installation in Matt Berry. No back-and-forth rescheduling — once it's booked, our team is there.

3

The work

We keep the dust under control and protect your Matt Berry home while we finish the drywall installation to a clean, paint-ready standard. Floors covered, doors sealed off, and the site left tidy at the end of every day.

4

Walk it with you

We don't pack up till you've walked the finished drywall installation with us and you're happy with the result in Matt Berry. If anything needs a second look, we handle it before we call the job done.

Rated by Edmonton Homeowners

Emplastrum Drywall is the drywall installation contractor Matt Berry trusts for repair, restoration and finishing — rated on Google by Edmonton homeowners.

Read the reviews, or leave your own after your drywall installation project in Matt Berry.

Read our reviews on Google

Drywall Installation Matt Berry: your questions answered

Do you hang the ceiling board first?
Yes, always. Ceiling board goes up before wall board on every job in Matt Berry. In Matt Berry, the wall board tucks under the ceiling board to support it. Out of order, Matt Berry ceiling joints carry their own weight and crack sooner. In Matt Berry, walls wait until the ceiling is boarded.
What board do you use for exterior basement walls in Matt Berry?
Moisture-resistant board on all Matt Berry exterior foundation walls and around plumbing and laundry. Standard 1/2” board for Matt Berry interior walls away from moisture. For Matt Berry legal suites: 5/8” Type X fire-rated on the ceiling and soundproof board on party walls. We specify the right product for each Matt Berry surface at the on-site quote.
Do you board for legal suites in Matt Berry?
Yes, and we know the spec. A legal secondary suite in Matt Berry requires 5/8” Type X fire-rated board on the ceiling separating the suite from the floor above, and STC soundproof board on the party walls. Moisture-resistant in all wet areas. The Matt Berry suite is boarded to that spec, and inspection follows.
Do you hang the ceiling board before the walls?
Yes, always. Ceiling board goes up first on every Edmonton installation job. Wall board butts up under the ceiling board and helps carry it. Reversing the sequence leaves ceiling joints unsupported — they crack sooner and perform worse under tape.
How long does drywall installation take in a Matt Berry home?
A standard basement in a Matt Berry home typically takes one to two days to board. In Matt Berry, a full new build or major renovation stretches the timeline. Honest scheduling in Matt Berry: the quoted timeline is the real one. Taping typically starts next-day on Matt Berry jobs.
Is drywall installation in Matt Berry a fixed price?
Yes. We assess the job on site, confirm the scope and give you a fixed price before we start. The number does not change after we begin.
Get Your Free Drywall Quote
Tell us about your project — we’ll get right back to you, 7 days a week. Prefer to call? (403) 829-8702.
No obligation. We never share your information.
📞  Call (403) 829-8702 Free Quote
See our latest drywall projects & updates on FacebookFollow Emplastrum Drywall — Edmonton, St. Albert, Sherwood Park, Spruce Grove & Stony Plain Follow on Facebook